Calculate how much concrete you need for a slab, patio, driveway, wall, footing, or column. See cubic yards, cubic feet, cubic meters, waste allowance, optional bag estimates, and cost.
Enter your project details below and press Calculate for an instant estimate.
Concrete quantity is based on volume. For a rectangular slab, patio, driveway section, footing, or wall, the basic calculation is length times width times thickness equals volume.
The most common mistake is mixing units. If the length and width are measured in feet but the thickness is entered in inches, the thickness must first be converted to feet. For example, suppose a slab is 12 feet long, 20 feet wide, and 4 inches thick. Four inches equals 4 divided by 12, which is about 0.3333 feet.
Now multiply: 12 × 20 × 0.3333 is approximately 80 cubic feet. One cubic yard contains 27 cubic feet, so 80 divided by 27 is approximately 2.96 cubic yards. That is the geometric concrete volume before adding any planning allowance.
Length and width are usually measured in feet, but thickness is often measured in inches. Dividing the inch measurement by 12 converts it to feet so that feet times feet times feet produces cubic feet.
| Step | Calculation |
|---|---|
| Convert thickness | 4 inches ÷ 12 = 0.3333 feet |
| Multiply consistent units | feet × feet × feet = cubic feet |
A slab's volume is its length times its width times its thickness. All three dimensions must be in the same unit before multiplying.
| Dimension | Role in Formula |
|---|---|
| Length | First multiplied dimension |
| Width | Second multiplied dimension |
| Thickness | Third multiplied dimension, converted to feet if measured in inches |
Concrete is a three-dimensional material. Square footage measures area. Concrete quantity requires volume, which means a slab's thickness matters just as much as its length and width. A 20 by 20 foot slab that is four inches thick does not require the same volume as a 20 by 20 slab that is six inches thick.
In U.S. ready-mix construction, concrete volume is commonly discussed in cubic yards. A cubic yard is 3 feet by 3 feet by 3 feet, which equals 27 cubic feet.
A cubic yard is arranged as 3 layers of 3 by 3 one-foot cubes, for 27 one-foot cubes in total.
| Arrangement | Total Cubic Feet |
|---|---|
| 3 × 3 × 3 one-foot cubes | 27 cubic feet = 1 cubic yard |
Divide by 27.
Example: 135 cubic feet divided by 27 equals 5 cubic yards. To move the other direction, cubic feet equals cubic yards times 27, so 5 cubic yards equals 135 cubic feet.
Start by converting four inches to feet: 4 divided by 12 equals 1/3 foot. Then multiply length times width times 1/3.
10 × 10 × 1/3 = 33.33 cubic feet. Divide by 27: 33.33 ÷ 27 is approximately 1.23 cubic yards, before any waste or field allowance.
12 × 12 × 1/3 = 48 cubic feet. 48 ÷ 27 is approximately 1.78 cubic yards.
The calculator above uses the exact dimensions you enter instead of relying on generic square-foot rules.
The mathematically calculated shape assumes a perfect project. Real pours may involve uneven subgrade, excavation variation, forms that are not perfectly exact, spillage, material remaining in equipment, and measurement error.
ACI educational material discusses adding an allowance beyond the calculated volume to account for conditions such as uneven subgrade, settlement, spillage, and waste. That does not mean every job needs the same percentage. CalculateThisWay therefore lets you choose 0%, 5%, 10%, 15%, or a custom allowance.
The calculator always separates the raw geometric volume from the waste allowance, so you can see exactly what came from your measurements and what came from your chosen allowance.
| Component | Amount |
|---|---|
| Calculated geometric volume | 2.96 cubic yards |
| 10% waste allowance | 0.30 cubic yards |
| Planning quantity | 3.26 cubic yards |
The page above always shows the raw geometric volume separately so you know what part came from measurements and what part came from the chosen allowance.
No. Ten percent is a common planning choice, not a universal engineering requirement. The appropriate allowance can depend on project size, subgrade condition, form accuracy, supplier practices, placement method, and site conditions.
ACI educational guidance notes that smaller quantities may sometimes use larger percentage allowances than larger placements. You should select the allowance appropriate to your project rather than having a calculator secretly add one for you.
A patio is usually calculated like a rectangular slab. Measure length, width, and thickness. For example, 15 ft by 12 ft by 4 in. Four inches is 0.3333 ft. Volume: 15 × 12 × 0.3333 is approximately 60 cubic feet. Cubic yards: 60 ÷ 27 is approximately 2.22 cubic yards. With a 10% planning allowance: 2.22 × 1.10 is approximately 2.44 cubic yards.
Use the same volume formula. However, the correct driveway thickness is not something a calculator should invent. Thickness can depend on vehicle loads, subgrade, reinforcement, local requirements, and project specifications. Enter the thickness specified for your actual project, and the calculator determines volume. It should estimate material quantity, not perform structural pavement design.
A solid rectangular concrete wall uses length times height times thickness. Suppose 20 ft long, 8 ft high, 6 inches thick. Six inches is 0.5 ft. Volume: 20 × 8 × 0.5 = 80 cubic feet. 80 ÷ 27 is approximately 2.96 cubic yards. Then apply the selected planning allowance.
Openings such as doors or windows should be subtracted only if they genuinely displace concrete in the wall design. If subtraction features are added, they should be displayed separately so the math stays transparent.
A rectangular footing also uses length times width times depth. If several identical footings are required, multiply by the quantity. For example, 8 ft long, 2 ft wide, 1 ft deep, four identical footings. One footing: 8 × 2 × 1 = 16 cubic feet. Four: 64 cubic feet. 64 ÷ 27 is approximately 2.37 cubic yards.
The calculator does not determine whether those footing dimensions are structurally adequate. ACI residential concrete guidance makes clear that footings are part of a larger structural system subject to applicable codes and project requirements.
A round column is a cylinder.
If the column diameter is 2 feet, the radius is 1 foot. If it is 8 feet tall, volume is π × 1² × 8, approximately 25.13 cubic feet. Convert: 25.13 ÷ 27 is approximately 0.93 cubic yards. Then multiply by the number of identical columns.
A rectangular pour uses length times width times depth. A round pour, such as a column, uses pi times radius squared times height.
| Shape | Formula |
|---|---|
| Rectangular (slab, wall, footing) | Length × Width × Depth |
| Round (column) | π × radius² × height |
Bag count depends on the actual yield of the product. The important number is not merely whether the bag weighs 40 lb, 60 lb, or 80 lb. Different products and mixes can have different stated yields. Use the yield printed on the product packaging.
Always round the bag count upward, because a fraction of a bag is still another bag. CalculateThisWay lets you enter the product's stated yield instead of assuming one generic yield applies to every brand and mix.
Small repairs or pours may be practical with bagged concrete. Larger placements are often supplied as ready-mixed concrete by volume. The calculator above does not decide which purchase method is appropriate for a specific project. It simply provides volume, an optional bag estimate, and an optional material cost. You can then compare supplier requirements and product instructions.
If a supplier quotes a price per cubic yard, multiply planning cubic yards by the price per cubic yard. Example: 3.5 cubic yards at $175 per cubic yard is an estimated concrete material cost of 3.5 × $175 = $612.50.
That is not necessarily the final project or delivery cost. There may also be delivery charges, short-load fees, tax, labor, forms, reinforcement, equipment, and site preparation. The calculator above labels this result estimated concrete material cost.
Square footage measures two-dimensional area. Concrete requires three-dimensional volume. If you only know the floor or slab area, the Square Footage Calculator can help determine the area. Once you know length, width, and concrete thickness, the Concrete Calculator above determines volume.
Metric volume is particularly straightforward when all measurements are in meters. Example: 6 m long, 4 m wide, 0.10 m thick. Volume: 6 × 4 × 0.10 = 2.4 cubic meters. If thickness is entered as centimeters, convert it: 10 cm = 0.10 m. The same principle applies in either measurement system: all dimensions must be expressed in compatible units before multiplying.
A calculator uses the dimensions and assumptions you enter. A supplier, contractor, or engineer may account for field measurements, delivery increments, minimum orders, pump requirements, uneven excavation, construction tolerances, and job-specific waste. The calculated result is therefore a planning estimate. It should not replace the construction documents or a professional quantity takeoff for a critical project.
Concrete quantity is a volume problem. For a rectangular pour: length times width times thickness. For a round column: pi times radius squared times height. Then convert the volume to the unit used by your supplier. In U.S. work, 27 cubic feet equals 1 cubic yard. CalculateThisWay shows the raw volume first, your waste allowance separately, and the final planning quantity clearly, so you understand every part of the answer.
The examples below use the exact same calculation engine as the calculator above. Values are computed live in JavaScript rather than typed in as fixed text, so they will always match what the calculator itself would return for these inputs.
Slab / Patio / Driveway. Length 12 ft. Width 20 ft. Thickness 4 in. Waste allowance 10%.
What is the planning quantity in cubic yards?
80 cubic feet geometric volume, which is about 2.96 cubic yards. With a 10% waste allowance, the planning quantity is about 3.26 cubic yards.
Enter your project dimensions, or a diameter and height for a round column, into the calculator above. It multiplies length by width by thickness, or uses the cylinder formula for a column, converts the result to cubic yards, cubic feet, and cubic meters, and adds your chosen waste allowance.
For a rectangular pour, multiply length by width by thickness after converting thickness to the same unit as length and width. For a round column, multiply pi by the radius squared by the height.
One cubic yard equals 27 cubic feet, since a cubic yard measures 3 feet by 3 feet by 3 feet.
Calculate the volume in cubic feet, then divide by 27. For example, 80 cubic feet divided by 27 is about 2.96 cubic yards.
Convert 4 inches to feet, which is 4 divided by 12, or about 0.3333 feet, then multiply by the slab's length and width in feet. A 10 ft by 10 ft slab at 4 inches needs about 1.23 cubic yards before waste.
A 10 ft by 10 ft slab at 4 inches thick is about 33.33 cubic feet, or roughly 1.23 cubic yards, before any waste allowance.
A 12 ft by 12 ft slab at 4 inches thick is 48 cubic feet, or about 1.78 cubic yards, before any waste allowance.
Volume depends on thickness. At 4 inches, a 20 ft by 20 ft slab is about 133.33 cubic feet, or roughly 4.94 cubic yards, before waste. Enter your exact thickness in the calculator above for a precise figure.
Measure the patio's length, width, and thickness, then use the Slab, Patio, Driveway mode above. A 15 ft by 12 ft patio at 4 inches thick is about 2.22 cubic yards before waste.
Use the same length times width times thickness formula as a slab. Driveway thickness depends on vehicle loads, subgrade, and local requirements, so enter the thickness specified for your project instead of a generic guess.
Multiply wall length by height by thickness. A 20 ft long, 8 ft high wall at 6 inches thick is 80 cubic feet, or about 2.96 cubic yards, before waste.
Multiply footing length by width by depth, then multiply by the number of identical footings. Four footings each 8 ft by 2 ft by 1 ft total 64 cubic feet, or about 2.37 cubic yards, before waste.
Divide the diameter by 2 to get the radius, then use pi times radius squared times height. A 2 ft diameter, 8 ft tall column is about 25.13 cubic feet, or roughly 0.93 cubic yards.
That depends on the project. The calculator lets you choose 0 percent, 5 percent, 10 percent, 15 percent, or a custom waste allowance to plan for uneven subgrade, spillage, and measurement variation.
Ten percent is a common planning choice for many pours, but it is not mandatory. Smaller jobs sometimes use a larger percentage allowance, and larger placements sometimes use a smaller one.
No. Waste allowance is a planning choice based on project size, subgrade condition, form accuracy, and supplier practices, not a fixed engineering requirement.
Divide the thickness in inches by 12. For example, 4 inches divided by 12 equals about 0.3333 feet.
Divide the volume you need by the yield printed on your specific concrete mix bag, then round up, since a fraction of a bag still requires a full bag.
No. Yield varies by product, bag size, and mix design. Always use the yield listed on the bag you plan to buy instead of a generic assumption.
Enter the yield per bag from the product packaging into the optional bag section, and the calculator divides your planning volume by that yield and rounds up to a whole number of bags.
Ready-mix pricing varies by region, supplier, and order size. Enter your supplier's quoted price per cubic yard, or cubic meter, into the optional cost field for a material-only estimate.
No. The cost estimate covers material only, based on the price you enter. It does not include delivery charges, short-load fees, tax, labor, forms, reinforcement, or equipment unless you add them yourself.
You can optionally round the planning amount up to the nearest 0.1, 0.25, 0.5, or 1 unit. This is a convenience for ordering, not a required step, since suppliers may have their own minimums or increments.
No. This calculator estimates concrete volume from the dimensions you enter. It does not replace structural design, reinforcement planning, or a review of applicable codes by a qualified professional.
Yes. Switch the unit system to Metric to enter dimensions in meters and centimeters and see your result in cubic meters, with cubic yards shown for reference.
One cubic meter is about 1.30795 cubic yards, based on the NIST conversion of approximately 0.7645549 cubic meters per cubic yard.
No. Square footage measures two-dimensional area. Concrete volume also depends on thickness, so the same square footage can require very different amounts of concrete depending on how thick the pour is.
The Square Footage Calculator finds the area of a space. The Concrete Calculator takes that length and width plus a thickness to find the three-dimensional volume of concrete needed.